JC Constructors completed improvements to Clear Lakes Hydroelectric Dam, an existing hydroelectric facility owned by Idaho Power Company.  The project required the demolition and reconstruction of a dam spillway as well as the spillway flow control gates and replacement of trash rack equipment.  A bulkhead to control large flows above the spillway and temporary flow channeling were significant efforts required for the project.  Project costs are $560,000.