Broadway Bridge - Boise, Idaho

JCC completed this project on an aggressive schedule that required removing and replacing the existing Broadway Avenue (Hwy 20) bridge over the Boise River in downtown Boise in eight months and on schedule for the Boise State Broncos season opener football game.  The project included relocating the Boise River twice, demolishing and removing the existing 60 year old four lane concrete bridge, driving 170 pile, construction of five cast-in-place concrete piers, placing ten steel girders that were each 420’ long, and constructing a 104’ wide concrete deck with belvedere sidewalks.  The bridge costs are $5M.