US 95 Bridge over Payette River - Fruitland, Idaho

This was an ITD project on US 95 near Fruitland, Idaho over the Payette River.  The project required JC Constructors to remove the existing northbound bridge and build three lanes of the new bridge.  JCC then dismantled and refurbished the southbound bridge to construct a new five lane, 3-span bridge that is 500-feet long.  The project cost was $6.3 million.